Project Details
Description
In building G on the VUB campus in Etterbeek, both education and research activities of the faculty of sciences and bio-engineering take place. The building dates from 1975 and is energy-wise outdated. The building will be renovated layer by layer and as first phase, the two upper floors (G8 and G9) with largest consumption of energy will be tackled (13% of the surface uses 54% of the total energy of the building). These two layers will be stripped almost completely. For this EFRO/FEDER application, we emphasize three topics that have an impact on energy efficiency and C02 emissions:
- Optimization of ventilation and fume cupboards,
- Relighting: labs and offices will be equipped with LED lighting,
- Reduction of energy consumption: installation of solar panels on building F&G.
Translated with www.DeepL.com/Translator (free version)
Acronym | BRGEOZ395 |
---|---|
Status | Finished |
Effective start/end date | 1/02/19 → 30/06/21 |
Keywords
- energy efficiency
- public buildings
- renovation
Flemish discipline codes in use since 2023
- Energy in buildings and built environments
- Built heritage and renovation
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.