Calculating in manpower systems, the minimal time from which the grade sizes, corresponding with the limiting structure, are attained

Research output: Book/ReportOther report

Original languageEnglish
PublisherSTOOTW/225, VUB.
Publication statusPublished - 1988

Bibliographical note

STOOTW/225, VUB.

Cite this