Abstract
Early offshore wind farms approach their decommissioning phase, yet a lack of precedents, potential legal bottlenecks, inadequate treatments and a lack of applicable circularity indicators, leave the sector unprepared, encompassing a risk of valuable materials loss. This paper presents a first-of-its-kind circularity analysis of the prospective decommissioning scenario of a North Sea wind farm, introducing and applying new circularity indicators. From the site-specific primary data, a bill of materials and material flow analysis was established,
differentiating between secondary applications and end-of-life destinations. The main share (80 %) of the installed mass originated from scour protection, acting as hotspot to the 84 % of materials remaining in situ. The collected fraction recycling rate approaches 90 %. However, the substantial discrepancies between components and materials implicate a need for component or material-specific targets to avoid valuable material loss. Introducing such collection or recycling targets could encourage more circular decommissioning practices along
the value chain.
differentiating between secondary applications and end-of-life destinations. The main share (80 %) of the installed mass originated from scour protection, acting as hotspot to the 84 % of materials remaining in situ. The collected fraction recycling rate approaches 90 %. However, the substantial discrepancies between components and materials implicate a need for component or material-specific targets to avoid valuable material loss. Introducing such collection or recycling targets could encourage more circular decommissioning practices along
the value chain.
| Original language | English |
|---|---|
| Article number | 107283 |
| Number of pages | 8 |
| Journal | Resources, Conservation and Recycling |
| Volume | 200 |
| DOIs | |
| Publication status | Published - Jan 2024 |
| Externally published | Yes |
Bibliographical note
Publisher Copyright:© 2023
Keywords
- Offshore wind energy
- Material flow analysis
- End-of-life
- Recycling indicators
- Circular economy
- Waste management
Fingerprint
Dive into the research topics of 'Prospective material flow analysis of the end-of-life decommissioning: Case study of a North Sea offshore wind farm'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver