Projecten per jaar
Samenvatting
Like many cities, Brussels faces increasing water issues like urbanization spreading and stresses on the water resources. Integrated Water Management (IWM) in urban planning tackles these problems focusing on the landscape features, but requires extensive cartographic data. Since 2010, different platforms offer cartographic data for the Brussels and Flemish regions, but these initiatives are independent and often not coherent. This article analyses the potentials and deficiencies of these cartographic data through two transboundary examples: the catchments of the Brussels area and the Molenbeek catchment. The article highlights how non-concordance and non-accessibility of the data constrain the application of IWM and other urban planning issues in transboundary areas.
Originele taal-2 | English |
---|---|
Artikelnummer | 89 |
Pagina's (van-tot) | 1-23 |
Aantal pagina's | 24 |
Tijdschrift | Brussels Studies |
Volume | 89 |
Status | Published - 6 jul. 2015 |
Vingerafdruk
Duik in de onderzoeksthema's van 'Coherent mapping for integrated water management in Brussels'. Samen vormen ze een unieke vingerafdruk.Projecten
- 5 Afgelopen
-
BRGEOZ262: Tracering van water wegen in Metropolitan Brussel
Claeys, P., Elskens, M., Brion, N. & Verbanck, M.
1/10/14 → 30/09/16
Project: Toegepast
-
PROGE37: Ontwikkeling van herstelstrategieën voor de restauratie van de natuur op het grondgebied van de stedelijke gemeenschap van Bordeaux - lot 4
Claeys, P., Lavigne, J. & Smets, B.
26/06/13 → 31/12/14
Project: Toegepast
-
BRGEOZ227: Oprichting van technische en methodologische aanbevelingen voor een duurzaam beheer van water in de wijk-schaal in het Brussels Gewest
De Bondt, K., Claeys, P. & Sorel, A.
15/02/13 → 14/02/14
Project: Toegepast