Temporal evolution of stiffness for offshore monopile foundations

Onderzoeksoutput: Poster

Samenvatting

Since 2011 OWI-lab has been conducting acceleration measurements on an offshore wind turbine with a monopile substructure at the Belwind wind farm. A site with layers of clay and sand. The main goal of the campaign was to validate the design with in-situ measurements on the operational turbine. Initial results confirmed that the actual resonance frequency was well above the as-designed values. Other researchers noted similar observations at different wind farms, concluding that in design the soil-stiffness was underestimated.
Originele taal-2English
StatusPublished - 2017
EvenementOffshore Wind Energy - London ExCel, London, United Kingdom
Duur: 6 jun 20178 jun 2017
http://offshorewind2017.com/conference

Conference

ConferenceOffshore Wind Energy
Verkorte titelOWE
Land/RegioUnited Kingdom
StadLondon
Periode6/06/178/06/17
Internet adres

Vingerafdruk

Duik in de onderzoeksthema's van 'Temporal evolution of stiffness for offshore monopile foundations'. Samen vormen ze een unieke vingerafdruk.

Citeer dit